Hayat Foundation Achievements Report for September 2026: 178 wells in five countries

Hayat Foundation Achievements September 2026: 178 wells Implemented within one month, in Five countries distributed over Two continentsAnd withThree types Of water projects.

This is the fifth report in the series, after May report AndJune AndJuly AndAugust.

Article summary:-

This article presents the outcome of September 2026: the number of wells implemented, their distribution into three types in percentages and numbers, the five countries included in the implementation across two continents, then the location of September among the rest of the months in the series, and finally the documentation up to the owner of each project.

Most notable numbers: 178 wells distributed over 125 manual surface wells (70%), and32 deep artesian wells (18%), and21 medium artesian wells (12%), in India, Pakistan, Bangladesh, Nepal and Tanzania.


1. September wells: 178 projects and three types

The table is as stated

Type Number Ratio
Manual surface well 125 70%
Deep artesian well Ablution 32 18%
Medium artesian well 21 12%
Total 178 100%

A note on the numbers themselves

The numbers are the result of rounding percentages to whole numbers, keeping the total at 178. Seventy percent of 178 equals 124.6, rounded to 125. We mention this because the number whose method of arrival is not explained is an incomplete number.

What does “deep well with ablution” mean?

It is one of the largest projects in terms of equipment, as it provides A water point more equipped for community use. This description appeared in the September report specifically.

Quick read of the table

Seventy percent of the month's projects are of one type. This does not mean a preference for this species, but rather that most of the sites where the team worked during September allowed access to water at a close depth. If the locations change next month, the percentage will change with them.

Why do the percentages change from month to month?

Because type follows land, not desire: the depth of good water at each site determines what is dug. The differences between types and their prices The cost of drilling a well is an ongoing charityThe project is fully explained in Digging a well is an ongoing charity.

I knew the types. Where was it implemented?


2. Five countries on two continents

Map

Continent Countries
Asia India · Pakistan · Bangladesh · Nepal
Africa Tanzania

Why is the number of continents mentioned and not just countries?

Because working on two continents means everything is different: the weather, the terrain, the local regulations, and the access routes. Implementing simultaneous projects in two different environments requires teams that know each environment from within, which we explained in Abroad well drilling company.

Five countries in one month means what in practice?

At least five field teams work in parallel, with five sets of local regulations, and different road and weather conditions. The implementation of 178 projects of this breadth goes through one series at each site: site selection, then coordination with the local team, then excavation and preparation, then documentation.

What was not mentioned in this month's report?

The distribution of the 178 wells among the five countries, nor the names of the regions within each country, has not been published. These are details we published in previous months, and we mention their absence here instead of skipping them. When we receive it, it will be added to this page.

A question remains for everyone who follows the series.


3. Why are there no beneficiary numbers this month?

Direct answer

Because the September report did not include beneficiary numbers, and we will not calculate them.

Why do we refuse to account for it?

We could have multiplied the number of each type by its estimated capacity to come up with a large number that would decorate the page. But this number will be From us, not from implementation recordsPeople will read it as if it were a field census.

Our rule in this series has been the same since the first report: A number that is not present in the month's report is not published. The missing number is more reliable than the estimated number, and a page that acknowledges what is missing is more trustworthy than a page without a blank space.

When the numbers arrive?

Its history is added here. The meaning of “absorptive capacity” and how it is read is explained in Reports of previous months.

This is about the absent. What about the present compared to what came before?


4. September is among the months of the series

Comparison with wells alone

month Wells
May 2026 480
June 2026 216
July 2026 190
September 2026 178

We tell it like it is

September was the lowest month in the number of wells since the publication of these reports. No reason for this was mentioned in the month’s report. We will not invent a reason for it.

Why publish the decline at all?

Because a series of reports that publish the rise and hide the decline are not reports, but rather arranged announcements. A reader who sees a lower number clearly published believes the higher numbers when they come.

Why is August not included in this schedule?

Because August report He announces 240 projects that include broader types than wells alone, and puts them in one column with well numbers to compare two different things.

Does a lower number mean less work?

Not necessarily. The number of projects depends on the requests received and the conditions of the sites, and the difference in the composition of the types changes the size of the work itself: a deep project is more equipped than a superficial project, so thirty deep projects are not the same as thirty superficial in effort or duration. This is why we display numbers and types together, not number alone.

Where does the comparison with species stand?

In September, the deep type advanced over the medium, unlike previous months. We do not base any conclusions on that Before it was confirmed that the “deep ablution” was the same as the “deep” of the previous months or a more comprehensively equipped project.

What remained up to the entrepreneur himself.


5. Documentation: What reaches the well owner?

The number alone is not enough

178 wells, a number belonging to the institution. As for what concerns you, that is Your project: Its location, its pictures before and after, a clip of it working, a plaque bearing the name you requested, and coordinates that you open yourself on the map.

This is detailed in How are well projects documented?, and real models in Documentation pageAnd a complete customer experience The story of nine wells.

Why do we care about water so much?

indicate World Health Organization Until 296 million people They take their water from unprotected wells and springs, and115 million They collect it from untreated surface water. The story of the foundation’s beginning and the reason for its focus on water in The story of Hayat Foundation.

Why do we publish a report every month at all?

Because the entity that publishes its figures month after month places itself under constant review: any reader can compare the months to each other, ask what is lacking, and notice what has changed. The report, which is issued once a year with aggregate numbers, does not tolerate this review. This is where the idea for this series came from.

And after delivery?

The project remains under follow-up, because the stopped well does not benefit anyone, and details of that are in Well maintenance.


Frequently asked questions for the September 2026 report

How many wells were completed in September 2026? 178 wells: 125 shallow, manual, 32 deep artesian, and 21 medium artesian.

In which countries were the September projects implemented? India, Pakistan, Bangladesh, Nepal and Tanzania, that is, four countries in Asia and one in Africa.

What is a deep artesian well for ablution? A larger model, providing a more fully equipped water point for community use.

Why are there no beneficiary numbers in this report? Because the month’s report did not include it, and we do not publish a number that we calculate and present as if it were a field census.

Is September less expensive than previous months? Yes, 178 wells is the lowest number recorded in the series, and no reason for this was given in this month's report.

Why doesn't August's number compare to these numbers? Because the August number includes broader project types than wells alone, it is not appropriate to place it in the same column.

How do I know exactly where my well is? With the geographical coordinates in the documentation file, you open it yourself on the map with photos and video.

Do I choose the country? Yes, the country is chosen by the customer when completing the order, and the location within it is determined by the team after evaluation.

Do you implement projects other than wells? Yes, in addition to water projects, there are sacrifices and other projects, but the September report was limited to water projects.

How do I start a project with my name? Select the type of Well projects, select the name you want on the board, then complete the order or Message us.


Your project in next month's report

Hayat Foundation Achievements September 2026: 178 wells in five countries across two continents, with three types of projects, and with published numbers as stated, with increases and decreases.

Start from Well projects, or follow the rest of the months in Reports page, or Ask us For any detail.

Only the number that is published in full is worth believing.